SCM Installation Primer

Stormwater Control Measures Installation Primer

The Colorado Stormwater Center offers a half-day workshop regarding what to inspect during the installation of stormwater control measures (SCMs).  Improper installation of extended detention basins, rain gardens, and permeable pavements can be a very large cost burden on future owners of SCMs.  By inspecting several critical components of SCMs while being installed, contractors, municipal staff, and the eventual owner can have more confidence in the long-term operation of the SCM.

Who Should Attend: Government (city/county/school) stormwater personnel, SCM inspectors, MS4 managers/coordinators, construction contractors, design engineers, property managers, homeowner’s association managers, etc.

Cancellation Policy: Cancellation requests must be made in writing and received by the Center no later than seven (7) days before the date of the training in order to receive a refund (less a $30 cancellation fee). No refunds will be issued after this date.

**The Center reserves the right to cancel the course no fewer than 7 days in advance if the minimum number of workshop participants has not been reached.

Scheduled Workshops


There are currently no scheduled workshops at this time.  If you are interested in participating in this workshop please contact us so that we may get a workshop scheduled in an area near you.

Workshop Presentation Handouts


Download handout material provided during the Stormwater Control Measure Installation Inspection workshop.

Explore Additional Training Opportunities